Fourteen Weeks Without a Sewer: Gel Deliveries to a Tower Crane Site
Eleven units, 120 workers, 17,640 uses and no drain: the consumption arithmetic for a 14-week site, plus the two site fixes that beat any dosing change.
Eleven units, 120 workers, 17,640 uses and no drain: the consumption arithmetic for a 14-week site, plus the two site fixes that beat any dosing change.
A site built its first stockpile of solidified cake to 6 m in three weeks, at a face slope close to 1:1.2, because that was the angle the loader could climb. Thirty days later the crest had dropped 240 mm, a tension crack 1.8 m deep had opened 12 m back from the face, and leachate was seeping from t…