Will It Pump? A Discharge Test the Receiving Site Will Accept
A 24 m³ tanker arrived at a receiving facility, connected to the 150 mm discharge, and ran the pump for twenty minutes without moving more than a third of its load. The gel had passed the producer’s paint filter test and met the moisture specification. It simply would not flow. Yield stress at…