Overdosing by 15 Percent: The Annual Cost of a Cautious Operator
A site designed for 22 kg/m³ ran at an average of 25.3 through the year. Nobody decided to do that. The dose crept: a wet month here, a rejected load there, a new operator who added half a bag to be safe, a scoop never checked against a scale. Across 12,000 m³ the excess came to 39.6 tonnes of polym…